Requirements Orders & Material Status

Requirements Orders & Material Status
Operator Guide Ver 1 Updated 2026-09-06 Matches the live screen

Requirements Orders & Material Status — Operator Guide

Open it from the Logistics Main Menu tile Requirements Orders & Material Status.

This is the list of every Requirements Order (RO) in the system — one row per order — and it is where you go to answer "what material does this job need, and where does it stand?". Nothing here changes an order; it is a list you search, then click into.

Step by step

  1. Type what you know into the search box: an RO number, the source order number (the FieldPulse or BuilderTrend job number), part of the job name, or part of the BOM name. Numbers search all four; words search job name and BOM name.
  2. Narrow it with the two dropdowns if you want — All statuses and All types.
  3. Press Apply. Clear puts the screen back to everything.
  4. Click the blue order number to open that order on the Requirements Order maintenance screen, where the individual material lines live.

The buttons on the filter bar

What each column means

ColumnWhat it tells you
Order #The RO number. Click it to open the order.
JobThe job the material is for.
BOM NameThe bill of material this order was built from. One job can have several ROs with different BOM names.
Source Order #The FieldPulse / BuilderTrend order it came from. If we know the FieldPulse job it is a link that opens FieldPulse in a new tab.
PriorityBlank normally, R when the order has been marked Rush, or the 1–5 priority FieldPulse sent us.
Job StatusThe status the source system last told us about the job, with the time we heard it (hover the cell).
TypeResidential, Commercial, Service or Truck.
Required DateThe date the material is needed.
StatusThe order's own status — see the next table.
LinesHow many material lines are on the order.
Not CompleteHow many of those lines still need something to happen. Grey zero = nothing left to chase.

What the order Status pills mean

StatusMeaning
OpenLive order, work still to do. Grey pill.
In ProcessSomething has started — material picked, ordered or received. Amber pill.
CompleteEvery line is finished. Green pill.
CancelledThe order was cancelled. Red pill.
EmptyThe order exists but has no material lines on it yet. Grey pill.

What "Not Complete" is counting

A line stops counting as "not complete" once it reaches Complete, Invoiced, Cancelled or Closed Short. Everything else — waiting to be picked, partly picked, on a PO, partly received — still counts. So Not Complete is your "how much of this job's material is still in flight" number.

Line-level material status (inside an order)

Click into an order and each line carries its own status:

Line statusMeaning
OpenNothing has happened to the line yet.
Partially On POSome of the quantity has been put on a purchase order.
On POThe whole quantity is on a purchase order.
Partially ReceivedSome of what was ordered has arrived.
ReceivedIt has all arrived.
InvoicedThe vendor invoice is in.
Partially IssuedSome has been picked and issued to the job.
CompleteThe line is satisfied.
Over-IssuedMore was issued than the line required (e.g. a full 500ft reel against a 450ft need). Amber.
Cancelled / Closed ShortSomebody deliberately stopped the line. Red.
HOLDThe line is held because it has an open import issue. It is a warning, not a block — it clears by itself when the last issue on that line is resolved or ignored.

Common mistakes

Sorting and issue flags (added 2026-09-07)

Click any column heading from Order # through Status to sort the list; click again to reverse it. Lines and Not Complete are not sortable. Sorting only rearranges the orders already on screen.

An order with unresolved import issues now shows a ⚠ n issues badge beside its status. Click it to go straight to that order's Issues to Resolve list.